Metro Line No. 1 Ben Thanh – Suoi Tien, Ho Chi Minh City, South of Vietnam

Metro line Kingpost KP-1

Metro line Kingpost KP-2

Commodity: Steel Pipe Piles use as Casing pipe

Location: Special bridge of package no. 2 – Elevated section and Depot

Specification : JIS A5525, SKK400

Dimensions : Ø1524mm x t12mm x L7.15m / L5.0m

Metro Line No. 1 connecting Ben Thanh Market in the downtown area and Suoi Tien Theme Park in District 9 stretches 19.7 kilometers, and consists of an 2.6-kilometer underground section and a 17.1-kilometer elevated section. The project has three underground stations and 11 stations on land. Previously, the project was planned for completion in 2017 and operation in 2018.

Metro-line-no-1-proposed-map.png

Initially, the project required an investment capital of US$1.09 billion sourced by the ODA loans and the State budget. However, adjustments and exchange rate volatility have pushed up the figure to US$2.47 billion.

It will take passengers about 30 minutes to commute between downtown HCMC and Suoi Tien Park at a maximum speed of 80 kilometer per hour on the underground track and 110 kilometers per hour on the elevated track.