25 March, 2019

Nghi Son Refinery and Petrochemical Complex, Thanh Hoa province

Nghi Son Site-1 - Copy

 

DCIM100MEDIADJI_0340.JPG

Commodity: Steel Pipe Piles, Steel Pipe Sheet Piles with Coating

Location: Berth & Harbor revetment

Specifications: JIS A5530 SKY490, P-P Ø165.2mm type; Coating epoxy 2 layers (1.074μm)

Dimensions:

  • Ø914.4mm x t18mm x L29.5m – L32.0m
  • Ø1500mm x t19mm x L32.5m

Nghi Son Refinery is the second planned oil refinery in Vietnam. It would be located about 200 kilometers (120 mi) south of Hanoi in Tinh Gia District of Thanh Hóa Province. Site-clearing for the project broke ground in 2008. Construction began on 23 October 2013, and refinery operations are targeted for 2017.[1] Planned capacity is 200,000 barrels per day (32,000 m3/d), slightly greater than that of Vietnam’s first Dung Quat refinery.[2][3] The site-clearing phase entails the resettlement of 350 households with 1,500 people and the surface leveling of the area.

Nghi Son Refinery and Petrochemical project will have the capacity to process 200,000 barrels of crude oil a day imported from the Middle East, producing petrochemical products such as gasoline, diesel oil, kerosene, jet fuel and polypropylene.

Engineering and Construction
A Joint Venture formed by Chiyoda Corp., JGC Corp., Technip, and South Korean contractors GS Engineering & Construction and SK Engineering & Construction were awarded an EPC Contract in January 2013. JGC is acting as the Joint Venture leader.